FIELD: oil and gas production.
SUBSTANCE: invention is related to oil production industry. Method includes cyclic injection of water into watered payout bed, sampling and testing of reservoir fluid samples, measurements of bed pressure and saturation of bug holes with fluids by means of downhole logging methods. In every cycle in phase of bed pressure rise, water injection to bed is carried out until bed pressure reaches limit - maximum value - not exceeding rated pressure values, when gas contained in bug holes is completely dissolved in oil, which is identified in compliance with mathematical expression. In phase of bed pressure decrease - limit - minimum value - its value is established not lower than the pressure, at which gas saturation of bug holes equals critical value that corresponds to beginning of filtration of gas in rock, which released from oil available in bugholes. If gas saturation of bug holes goes below specified minimum value, prior to another cycle of water injection in pool, rated volume of gas or water-gas mixture is injected.
EFFECT: improved oil recovery of bed by water injection.
2 cl, 2 dwg, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF MASSIVE OIL DEPOSIT | 2007 |
|
RU2339799C1 |
METHOD OF OIL RESERVOIR DEVELOPMENT | 2009 |
|
RU2391495C1 |
METHOD FOR INTENSIFICATION OF OIL RECOVERY | 1993 |
|
RU2066744C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1990 |
|
RU2088750C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2490438C1 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSIT AND OIL FRINGE | 1994 |
|
RU2085712C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2090742C1 |
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM RESERVOIR | 2009 |
|
RU2424424C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2114986C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2016 |
|
RU2618246C1 |
Authors
Dates
2009-08-27—Published
2008-01-09—Filed