FIELD: mining industry. SUBSTANCE: survey is conducted at several levels by height in horizontal and vertical plans. Survey operations are performed in two stages. During first stage general horizontal survey of section is executed from above from height point. During second stage-vertical survey (side) of each bench of stripping by movement of survey gear along vertical above same point. For provision of scaling of shots and their referencing to surface and to each other marking of benches is carried out before start of survey. For provision of matching of horizontal shots marking signs are installed on upper edges of benches and have horizontal and vertical parts. Same figure is applied to vertical and horizontal parts of each marker. EFFECT: enhanced functional efficiency of method. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPENCAST MINING OF MINERALS | 1995 |
|
RU2112880C1 |
METHOD OF TRANSPORTATION OF BARREN ROCKS TO DUMP | 1996 |
|
RU2100609C1 |
TRANSPORTATION COMPLEX FOR OPENCAST MINING OPERATIONS | 1996 |
|
RU2133341C1 |
METHOD OF OPENCAST MINING OF MINERAL DEPOSITS | 2002 |
|
RU2213224C1 |
PROCESS OF TRANSPORTATION OF ROCK MASS TO DISPOSAL AREA OF STRIPPING | 1999 |
|
RU2151871C1 |
OPEN PT TRANSPORTATION COMPLEX | 1998 |
|
RU2154163C2 |
METHOD OF MICK HAULAGE TO LOWER HORIZONS | 1998 |
|
RU2159853C2 |
METHOD OF ARTIFICIAL VENTILATION OF OPENCASTS | 2002 |
|
RU2215157C1 |
METHOD FOR TRANSPORTATION OF ROCK MASS | 1996 |
|
RU2114308C1 |
DEVICE FOR VENTILATION OF OPENCASTS | 2000 |
|
RU2172838C1 |
Authors
Dates
1997-08-20—Published
1992-03-16—Filed