FIELD: oil and gas production. SUBSTANCE: downhole device with measuring electrodes is sunk in cemented casing string below perforation interval. During its rise, curve of change in electric potential between measuring and grounded electrodes is registered and, from the peculiar features of change in electric potential of string after perforation, one estimates perforation quality. Additionally, before and after perforation, device for electromagnetic crack detection in casing strings and acoustic control of cementation is sunk in casing string below the head of proximate bed-collector lying below perforation interval. When being raised, curves of change in measured parameters are registered and, from configuration and extension of changes in curves registered after perforation, one judges about borders of perforated interval and degree of alteration in its insulation caused by perforation. Quality of perforation is estimated from whole complex of curves describing changes in electric potential of string, indications of electromagnetic crack detection of string, and acoustic control of well cementation. EFFECT: facilitated well perforation quality control. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING THE CASING STRING PERFORATING QUALITY IN A BOREHOLE | 0 |
|
SU1751304A1 |
METHOD FOR DETERMINING INTERVAL AND QUALITY OF CASING PERFORATION IN A WELL | 2022 |
|
RU2796148C1 |
METHOD DETERMINING PERFORATION INTERVAL AND PERFORATION QUALITY | 1999 |
|
RU2176731C2 |
METHOD FOR PREVENTING OIL/GAS/WATER MANIFESTATION AND INTER- STRATUM CROSS OVER IN BEYOND STRING SPACE | 1993 |
|
RU2061169C1 |
METHOD TO DETERMINE GAS-SATURATED INTERVALS IN CASING ANNULUS OF WELL | 2006 |
|
RU2304215C1 |
METHOD FOR DETERMINING INTERVAL AND PERFORATION QUALITY OF CASING COLUMN IN A WELL | 2005 |
|
RU2298648C1 |
METHOD FOR IDENTIFICATION OF BEHIND-CASING FLOWS AND CASING STRINGS CORROSION ZONES IN PRODUCTION WELLS | 2015 |
|
RU2610935C2 |
METHOD FOR DETERMINATION OF CORROSION OF CASING STRINGS IN PRODUCTION WELLS | 2015 |
|
RU2593926C1 |
METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE AND HEAVY WATERING | 2008 |
|
RU2370636C1 |
WELL EFFICIENCY RECOVERY AND START UP OF STAND BY WELLS WITH COMPLICATED DESIGN COLLECTORS IN ALFP CONDITIONS AND PRODUCTION STRING BOTTOM PART COLLAPSE | 2008 |
|
RU2379498C1 |
Authors
Dates
1997-11-27—Published
1995-03-24—Filed