FIELD: construction, applicable in erection of structures worked deeper in ground: fences of foundation trenches, walls, mooring and other structures, construction of foundations, basements, embankment walls, etc. SUBSTANCE: the method consists in installation of two rows of fencing members in the ground and joining of fencing members of different rows at least by one tier of horizontal members; the clear distance between the raws of fencing members at the building site surface elevation is taken to be equal to (0.5 to 5.0)d, where d - maximum cross-section of the fencing member, and the horizontal members are made in the form of girders with the stiffness of the member cross-section making up 0.5 to 5.0 of the stiffness of the fencing member cross-section; the girders are positioned between the rows of the fencing members and joined to them. EFFECT: facilitated procedure. 4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF WALLING IN EARTH | 1996 |
|
RU2096559C1 |
METHOD FOR ERECTION OF GUARDING WALL IN EARTH | 1996 |
|
RU2095520C1 |
METHOD OF SINKING LINEAR MEMBER INTO GROUND | 2001 |
|
RU2203358C2 |
METHOD FOR MAKING PILE IN GROUND | 1995 |
|
RU2081969C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE | 2022 |
|
RU2800171C1 |
METHOD FOR ARRANGEMENT OF PIT SIDES BARRIERS IN SATURATED SOILS | 2009 |
|
RU2404327C2 |
METHOD OF PILE CONSTRUCTION | 2001 |
|
RU2205262C2 |
METHOD OF ERECTING TONGUE-AND-GROOVE ENCLOSURE DURING MAIN PIPELINE OPERATIONS AND SHEET COLLAPSIBLE ENCLOSURE FOR CONSTRUCTION OF PIT | 2018 |
|
RU2705674C2 |
Authors
Dates
1997-12-10—Published
1996-06-11—Filed