FIELD: construction engineering. SUBSTANCE: according to method, at least from part of bore-hole depth, drill string is removed by steps. At first step, drill string is lifted to height h which is equal to 3-7 diameters of drill working member, then it is lowered to depth equal to h. At all subsequent steps, drill string is lifted to height h also equal to 3-7 diameters of drill working member, and then it is lowered to depth equal to 0.5 h. EFFECT: high efficiency. 4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PILE CONSTRUCTION | 2001 |
|
RU2205262C2 |
METHOD OF INSTALLATION OF FENCE IN GROUND | 1996 |
|
RU2098559C1 |
METHOD FOR CONSTRUCTION OF WALLING IN EARTH | 1996 |
|
RU2096559C1 |
METHOD FOR PRODUCING PILES IN GROUND | 1995 |
|
RU2081242C1 |
METHOD FOR ERECTION OF GUARDING WALL IN EARTH | 1996 |
|
RU2095520C1 |
METHOD FOR PRODUCING CAST-IN-PLACE PILES | 1993 |
|
RU2039156C1 |
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2318960C2 |
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
Authors
Dates
1997-06-20—Published
1995-09-04—Filed