FIELD: mining industry; may be used in designing and mining of outburst-prone deposits. SUBSTANCE: method includes determination of extent of tectonic disturbances and magnitude of stresses, blasting the rock mass with different delays. Novelty in that after determination of extent of tectonic disturbances and magnitudes of stresses, explosive charges of various masses are blasted in succession in mass rock and location of contacts of geological structures are determined after each blasting with the help of the offered formula. EFFECT: higher efficiency. 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WARNING ABOUT DYNAMIC OCCURRENCES AT INDUSTRIAL EXPLOSIONS | 1998 |
|
RU2148718C1 |
METHOD FOR PREVENTION OF ROCK BURSTS AT LARGE-SCALE EXPLOSIONS | 1995 |
|
RU2083848C1 |
METHOD FOR DETECTION OF SEATS OF ROCK BURSTS | 0 |
|
SU1800057A1 |
METHOD OF PREVENTION OF ROCK BUMPS | 0 |
|
SU1803585A1 |
METHOD PREVENTING DYNAMIC PHENOMENA IN DISTURBED ROCKS WHILE DEVELOPING MINERAL RESOURCES ( VARIANTS ) | 2001 |
|
RU2201508C2 |
METHOD FOR BUILDING AND EQUIPPING SUBSURFACE STATIONS FOR OBSERVING MOTION OF EARTH CRUST TO PREDICT EARTHQUAKES INCLUDING THOSE MAN-CAUSED | 2000 |
|
RU2183331C1 |
METHOD FOR SUPPORT OF MINE WORKINGS UNDER CONDITIONS OF STRESSED STATE OF ROCK MASS | 1996 |
|
RU2097566C1 |
METHOD TO PREPARE BLOCKS IN LARGE DEPTHS | 1991 |
|
RU2029868C1 |
METHOD OF RELIEF OF MASSIF STRESS-STRAIN STATE | 0 |
|
SU1705593A1 |
METHOD FOR INSTALLATION OF BLASTING NETWORK FOR CRUSHING OF DIFFICULTY EXPLOITABLE ROCKS | 1998 |
|
RU2150673C1 |
Authors
Dates
1997-12-10—Published
1995-11-21—Filed