METHOD FOR WATER INFLOW ISOLATION IN NON-CASED HORIZONTAL PART OF PRODUCTION WELL BORE Russian patent published in 2006 - IPC E21B33/13 

Abstract RU 2273722 C2

FIELD: oil and gas industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.

SUBSTANCE: method involves removing pumping equipment from borehole; lowering tubing string in well; injecting hardening water-proofing solution in well through tubing string; forming water-tight layer in front of water-developing formation intervals. The water-proofing solution is cement mix modified with polyvinylacetate reagent taken in amount of 0.25-0.5% by cement weight. The water-proofing solution volume provides filling of hole annuity in non-cased horizontal well bore part through flow string lowered to horizontal well bore part bottom. Then the water-proofing solution is held in well for 2-3 hours and flushed out from the hole annuity by direct or reverse circulation after cement hardening initiation.

EFFECT: reduced time and material consumption.

2 dwg

Similar patents RU2273722C2

Title Year Author Number
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS 2014
  • Makhmutov Ilgizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Mansurov Ajdar Ulfatovich
RU2578095C1
WATER FLOW ISOLATION TECHNIQUE IN UNCASED HORIZONTAL BOREHOLE SECTION OF PRODUCING WELL 2014
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Nizaev Ramil' Khabutdinovich
  • Khasanova Dil'Barkhon Kelamedinovna
RU2560018C1
METHOD FOR HORIZONTAL WELL OPERATION 2011
  • Ibragimov Nail' Gabdulbarievich
  • Torikova Ljubov' Ivanovna
  • Musaev Gajsa Lemievich
  • Isakov Vladimir Sergeevich
RU2447265C1
METHOD OF WELL'S HORIZONTAL BOREHOLE PART REPAIR INSULATION WORKS 2008
  • Makhmutov Il'Gizar Khasimovich
  • Zhirkeev Aleksandr Sergeevich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Asadullin Marat Fagimovich
RU2379472C1
METHOD FOR ISOLATING THE INFLOW OF FORMATION WATER IN AN UNCASED HORIZONTAL SECTION OF THE WELLBORE 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Yagafarov Alik Kayumovich
  • Leonteva Natalya Alekseevna
  • Zhigalkovskaya Mariya Igorevna
  • Spekhova Svetlana Aleksandrovna
  • Zhaparova Darya Vladimirovna
RU2661171C1
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END 2022
  • Sukovitsyn Vladimir Aleksandrovich
  • Gavrilov Andrej Aleksandrovich
RU2794105C1
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS 2015
  • Evdokimov Aleksandr Mikhajlovich
  • Nizaev Ramil Khabutdinovich
  • Novikov Igor Mikhajlovich
  • Bakirov Ilshat Mukhametovich
  • Kadyrov Ramzis Rakhimovich
  • Khasanova Dilbarkhon Kelamedinovna
RU2597220C1
METHOD FOR ISOLATION OF FORMATION WATER INFLUX AT SECTIONS OF THEIR SUPPLY IN WELLS WITH HORIZONTAL TERMINATION 2019
  • Leontev Dmitrij Sergeevich
RU2707109C1
PROCEDURE FOR SELECTIVE ISOLATION AND RESTRAINT OF WATER PRODUCTION INTO HORIZONTAL WELLS 2008
  • Pavlov Ivan Vladimirovich
  • Akimov Nikolaj Ivanovich
  • Kazanbaeva Oksana Vladimirovna
RU2363841C1
METHOD FOR WELL CASING WITH RESERVOIR PROPERTIES RETENTION IN PRODUCTIVE BED 2003
  • Ibragimov Nail' Gabdulbarievich
  • Vakula Andrej Jaroslavovich
  • Kateev Rustem Irekovich
  • Kateeva Raisa Irekovna
RU2268351C2

RU 2 273 722 C2

Authors

Khisamov Rais Salikhovich

Kateev Irek Sulejmanovich

Kateev Rustem Irekovich

Salikhov Mirsaif Mirgazijanovich

Kandaurova Galina Fedorovna

Dates

2006-04-10Published

2004-03-18Filed