FIELD: construction engineering. SUBSTANCE: this relates to trenchless laying of service lines. According to method, tube of increased length is driven into ground. This requires high axial shock loads to be applied by means of striking mechanism with subsequent cleaning of tube from ground contained in it. Axial shock loads are applied in middle part of tube. This improves transmission of force and cuts energy consumption. Substantial increase of length of pipeline driven can be achieved if at force application point, tube is cut into pieces with cleaning them individually, and after cleaning front part of tube and connecting rear part to it, driving is continued to end, with cleaning performed from front end of tube. EFFECT: high efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES | 1996 |
|
RU2105919C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINE | 1995 |
|
RU2099624C1 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF PIPELINE IN GROUND | 1995 |
|
RU2101421C1 |
DEVICE FOR SINKING PIPES INTO GROUND | 1996 |
|
RU2135692C1 |
METHOD OF AND DEVICE FOR TRENCHLESS LAYING OF SERVICE LINES | 1997 |
|
RU2134747C1 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF UNDERGROUND SERVICE LINES | 2000 |
|
RU2184191C1 |
METHOD FOR TRENCHLESS LAYING PIPELINES | 1991 |
|
RU2047697C1 |
METHOD OF TRENCHLESS UNDERGROUND COMMUNICATIONS LAYING AND DEVICE FOR ITS IMPLEMENTATION | 2002 |
|
RU2229566C1 |
IMPACT-ACTION DEVICE | 1995 |
|
RU2097494C1 |
METHOD OF REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115856C1 |
Authors
Dates
1998-01-27—Published
1995-04-28—Filed