FIELD: environmental protection. SUBSTANCE: method is intended for creating artificial landscapes after cluster well drilling is completed. Task is solved by way of suppressing fluidity of coagulation clots of exhausted drilling mud with high-moor peat, which is then covered with mineral ground. EFFECT: facilitated solution of task.
Title | Year | Author | Number |
---|---|---|---|
EARTH SUMP RECLAMATION METHOD | 2004 |
|
RU2273736C1 |
METHOD FOR DISMOUNTING EARTH STORAGES | 1999 |
|
RU2170304C2 |
METHOD FOR RECULTIVATION OF EARTH WAREHOUSE | 2002 |
|
RU2245352C2 |
METHOD FOR RECLAMATION OF SLUDGE PITS UNDER CONDITIONS OF WARM PERIODS | 2018 |
|
RU2691797C1 |
METHOD OF RECLAMATION OF DRILLING SLUDGE CULVERT | 2018 |
|
RU2702184C1 |
METHOD OF A STORAGE BARN RECULTIVATION | 2003 |
|
RU2251564C2 |
EARTH STORAGE RECLAMATION METHOD. | 2007 |
|
RU2347908C2 |
METHOD OF RECULTIVATION OF SLUDGE PIT UNDER CONDITIONS OF ETERNAL FROST | 2007 |
|
RU2333360C1 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
METHOD FOR LIQUIDATION OF GROUND STORAGE-COLLECTOR OF DRILLING WASTE | 1997 |
|
RU2123574C1 |
Authors
Dates
1998-04-20—Published
1994-08-10—Filed