FIELD: parking of automobiles. SUBSTANCE: combination underground garage-parking has two foundation pits connected by tunnels whose ends are square to pits. Tunnels are built using closed method. Automobiles are arranged in tunnels at different levels. Pit has system of ramps with built in automobile arrangement levels. Underground working is made by working out of one pit, cutting tunnel by means of mine driving equipment, working out second pit and finishing tunnel cutting. Equipment is shifted into second pit to cut other tunnel. EFFECT: facilitated building of underground garage. 3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTILEVEL GARAGE SETUP | 1997 |
|
RU2129197C1 |
MULTITIER GARAGE COMPLEX | 1997 |
|
RU2139398C1 |
UNDERWATER GARAGE FOR VEHICLES AND METHOD TO CONSTRUCT UNDERWATER GARAGE | 2010 |
|
RU2468151C2 |
MULTISTORIED POWER-OPERATED MONORAIL GARAGE | 1996 |
|
RU2119030C1 |
SUBWAY LINE IN DEEP URBAN AREAS | 2023 |
|
RU2808273C1 |
GARAGE DEVICE | 2011 |
|
RU2455438C1 |
MODULE OF MULTI-LEVEL GARAGE | 2008 |
|
RU2370608C1 |
DEMOUNTABLE MULTI-LEVEL PARKING AREA | 2008 |
|
RU2385399C2 |
BUILDING "A"- ADMINISTRATIVE, COMMERCIAL AND OFFICE BUILDING IN A RAIKIN CENTRE OF CULTURE, ART AND LEISURE | 2007 |
|
RU2341631C1 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
Authors
Dates
1998-05-20—Published
1996-02-01—Filed