FIELD: machines or devices for shifting tracks. SUBSTANCE: in proposed method accuracy of measurement of rail line deflection is determined, as follows: stretched cable-chord of liner is displaced in parallel position and is fixed in this position, displacement of carriages along guides is measured and value of displacement of carriages is compared with value of displacement of cable-chord. Difference in these values manifests defects in measuring system of linear. Stretched cable-chord is fixed by means of frames secured on end trucks of linear, rollers installed on frames for engagement with cable-chord at its parallel displacement and locks located at measuring trucks of linear and consisting on rack with angle plates. EFFECT: provision of accurate checking of operation of liner measuring system. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DOUBLE-CHORD ARROW-GRAPH FOR TRUEING OF RAILWAY TRACK BY CALCULATION | 1998 |
|
RU2147638C1 |
CURVILINEAR TRACK SECTION LINING METHOD | 1997 |
|
RU2114235C1 |
RACK-LINING DEVICE | 1997 |
|
RU2112104C1 |
STRAIGHT TRACK SECTION LINING METHOD | 1997 |
|
RU2114236C1 |
METHOD AND DEVICE FOR TRUEING OF RAILWAY TRACK ACCORDING TO PRESET DISPLACEMENTS | 1998 |
|
RU2147639C1 |
METHOD AND DEVICE FOR TRUEING OF STRAIGHT SECTIONS OF RAILWAY TRACK | 1998 |
|
RU2147637C1 |
DEVICE FOR STRAIGHTENING RAILWAY TRACK | 0 |
|
SU779488A1 |
RAILWAY TRACK ALIGNMENT METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2824765C1 |
BOOM MONITOR | 0 |
|
SU1157155A1 |
METHOD OF, DEVICE FOR, AND MACHINE FOR TRACK MAINTENANCE | 2001 |
|
RU2230848C2 |
Authors
Dates
1998-06-27—Published
1996-10-21—Filed