FIELD: construction engineering. SUBSTANCE: method implies making bore-hole with using casing pipe, installation of reinforcing framework and electric discharger unit, filling bore-hole with hardening electric-conducting material, formation of bore-hole with widenings by means of performing high-voltage electric discharges at different levels. Casing pipe is of length which is larger than depth of bore-hole. Before filling of casing pipe with hardening material, plate is put over casing pipe with pipe connection having flange which embraces casing pipe with clearance. Plate is located on ground surface and clearance is hermetically sealed with stuffing material. Then, put over casing pipe is removable cover with sealing flange by means of which stuffing material is compacted and cover is fixed to pipe connection of plate. As casing pipe is being removed, executed at various levels are high-voltage electric discharges. As discharger unit is moving closer to day surface at distance equal to 2-3 diameters of bore-hole, electric-conducting material is added by pouring-in to height equal to 0.8-0.9 of bore-hole depth. Last level where high-voltage discharges are performed is located in plane of plate. Application of aforesaid method ensures higher load-bearing capacity of pile under vertical and horizontal loads. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
METHOD FOR PRODUCING CAST-IN-PLACE PILES | 1993 |
|
RU2039156C1 |
METHOD AND DEVICE FOR STABILIZATION OF EARTH STRUCTURE | 1997 |
|
RU2117727C1 |
BORED PILES MANUFACTURING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2713824C1 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
METHOD OF PRODUCING PILES FOR STRENGTHENING EARTHWORKS | 2017 |
|
RU2657879C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
METHOD OF BORED PILE PRODUCTION AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2570695C1 |
METHOD FOR STABILIZATION OF EARTH STRUCTURE | 1997 |
|
RU2117728C1 |
Authors
Dates
1998-08-20—Published
1997-09-24—Filed