FIELD: mining industry. SUBSTANCE: this is intended for use in cutter-loader extraction of ore from contiguous flat seams. Ore recovery is carried out by coaxially located alternating single-entry chambers and multiple-entry chambers. Left between entries of chambers are pliable pillars which are located in seams noncoaxially relative to each other. Being formed above multiple-entry chambers of upper seam is arch of relieved rock. Central part of each multiple-entry chamber in upper seam is being worked after driving through leading single-entry chamber. Application of aforesaid method reduces cost of ore extraction due to increased productivity without impairing safety of mining operations. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF ADJACENT FLAT POTASSIUM SEAMS BY NON-COAXIAL CHAMBERS | 1995 |
|
RU2083829C1 |
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
METHOD FOR MINING THICK SALT OUTBURST-PRONE SEAMS WITH COMPLICATED HYPSOMETRY OF THEIR OCCURRENCE | 1991 |
|
RU2015329C1 |
METHOD FOR THICK FLAT-LAYING POTASSIUM SEAM DEVELOPMENT | 2006 |
|
RU2310074C1 |
METHOD OF COMBINED DEVELOPMENT OF CONTIGUOUS FORMATION OF DIFFERENT THICKNESSES | 2013 |
|
RU2532945C1 |
METHOD FOR MINING OF GENTLY DIPPING CONTIGUOUS POTASSIUM BEDS | 1995 |
|
RU2099526C1 |
ADJACENT POTASSIUM SEAM MINING METHOD | 0 |
|
SU1765418A1 |
METHOD OF WORKING ADJACENT EXPLOSION-HAZARDOUS BEDS | 0 |
|
SU889854A1 |
METHOD FOR MINING SEAM FORMATIONS OF MINERALS | 1994 |
|
RU2081318C1 |
METHOD FOR THICK GENTLY SLOPING POTASSIUM FORMATION DEVELOPMENT | 2004 |
|
RU2272137C1 |
Authors
Dates
1998-08-20—Published
1996-07-29—Filed