FIELD: mining industry. SUBSTANCE: with leading extraction of the first stage rooms, rigid interroom pillar is formed in lower bed, then it is relieved by extraction of mineral in upper bed by rooms with formation of yielding pillars. Then in zone of relief of lower bed, secondary rooms are extracted in rigid interroom pillars. In this case yielding pillars are formed between rooms of the second stage. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD OF COMBINED DEVELOPMENT OF CONTIGUOUS FORMATION OF DIFFERENT THICKNESSES | 2013 |
|
RU2532945C1 |
METHOD FOR MINING THICK SEAMS OF POTASSIUM-MAGNESIUM SALTS | 1996 |
|
RU2110687C1 |
PROCESSING OF POTASSIC SEAMS | 2013 |
|
RU2524084C1 |
METHOD FOR PREPARATION OF EXCAVATION SITE AT CHAMBER DEVELOPMENT SYSTEM | 2015 |
|
RU2577570C1 |
METHOD FOR DEVELOPMENT OF CONTIGUOUS FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2117760C1 |
METHOD FOR WORKING STARTA OF GENTLY SLOPING AND CLOSE FORMATIONS OF WATER-SOLUBLE MINERALS | 0 |
|
SU1038481A1 |
METHOD OF WORKING ADJACENT EXPLOSION-HAZARDOUS BEDS | 0 |
|
SU889854A1 |
METHOD FOR REDUCING DEFORMATION OF WATER-PROTECTIVE MASS AND GROUND SURFACE | 1996 |
|
RU2118455C1 |
METHOD OF CREATING A ZONE OF GENTLE SLOPING OF ROOF | 0 |
|
SU1585519A1 |
Authors
Dates
1997-12-20—Published
1995-10-31—Filed