FIELD: mining, particularly methods for rock salt or potash salt mining.
SUBSTANCE: method involves outlining excavation block with development entries; forming incline before mineral mining in chamber; performing block mineral cutting in several layers along with goad filling with halite and delivering sylvinite to day surface; cutting chambers by means of selective winning machine from the incline for the full chamber length beginning from upper sylvinite layer along with roof supporting with bolts; using cut halite as filling material for chamber section filling in dependence of halite capacity and degree of fragmentation so that filled and empty chambers alternate with each other.
EFFECT: increased quality of sylvinite ore production due to selective cutting thereof in layers and increased roof control ability.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2584485C1 |
DEVELOPMENT OF THICK FLAT-LYING POTASH BEDS | 2014 |
|
RU2567576C1 |
METHOD FOR THICK GENTLY SLOPING POTASSIUM FORMATION DEVELOPMENT | 2004 |
|
RU2272137C1 |
METHOD FOR EXTRACTION OF MASSIVE SLOPING POTASSIUM BEDS | 2004 |
|
RU2254472C1 |
PROCESSING OF POTASSIC SEAMS | 2013 |
|
RU2524084C1 |
METHOD TO DEVELOP POTASSIUM BEDS | 2009 |
|
RU2412351C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING POTASSIUM BEDS | 2010 |
|
RU2435957C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF DEVELOPMENT OF THICK SLOPING POTASSIUM BED WITH ROCK SALT INTERBED | 2009 |
|
RU2421616C1 |
Authors
Dates
2007-11-10—Published
2006-03-28—Filed