FIELD: drilling and running of oil and gas wells. SUBSTANCE: design peculiarities of proposed plant allow it to be operated under three conditions: usage of exhaust gases of operating internal combustion engine, usage of casing-head gas of relatively low pressure ( 0.2-0.8 MPa) and usage of casing-head gas of relatively high pressure ( over 0.8 MPa ). For operation under first condition pressure pipe-line communicates with one end via check valve and first gate valve with exhaust branch pipe of internal combustion engine and with other end - with intake pipe booster pump via second gate valve. For operation under other two conditions pressure pipe-line is fitted with two tees communicating it selectively with two independent sources of low- and high-pressure casing-head gases. EFFECT: expanded technological capabilities of proposed plant. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PLANT FOR PREPARATION AND DELIVERY OF INERT GAS MIXTURES | 1997 |
|
RU2119096C1 |
METHOD AND DEVICE FOR PREPARATION OF GAS-AND- LIQUID MIXTURE | 1998 |
|
RU2149280C1 |
MOBILE UNIT FOR PREPARATION AND DELIVERY OF GAS-AND-LIQUID MIXTURE OR GAS TO WELL | 2004 |
|
RU2289723C2 |
INSTALLATION FOR INJECTION OF LIQUID-GAS MIXTURE | 1998 |
|
RU2151912C1 |
INSTALLATION FOR INJECTION OF LIQUID-GAS MIXTURE | 1997 |
|
RU2151911C1 |
METHOD OF PRODUCING INERT GAS-LIQUID HIGH-PRESSURE MIXTURES | 2005 |
|
RU2293860C2 |
METHOD INCREASING PRODUCTIVITY OF OIL WELL | 1998 |
|
RU2144135C1 |
GAS-LIQUID MIXTURE PRESSURE FEEDING DEVICE | 1998 |
|
RU2145677C1 |
METHOD AND DEVICE FOR GAS QUASIISOTHERMAL COMPRESSION AND TRANSFER | 1998 |
|
RU2151913C1 |
METHOD OF HEAT TREATMENT OF BOTTOM-HOLE ZONE OF OIL-GAS WELL | 2000 |
|
RU2168619C1 |
Authors
Dates
1998-10-27—Published
1997-09-12—Filed