FIELD: mining industry. SUBSTANCE: according to method, bore-holes for loosening floor rock from longwall are drilled in part of surface of worked-out area which is not covered by bore-holes which are contouring stoping field of workings. In this case, angle of incline of bore-holes is equal to angle of declining or sliding-down of rock. Length of bore-holes corresponds to probable design volume of reservoir. Distance between bore-holes over longwall is equal to 1.8 radius of its action. Distance between rows of bore-holes across longwall is equal to daily advance of longwall. Provided in water draining ditch in lower haulage way is opening by means of which regulated is water flow discharged from worked-out space to water collecting sump of mine for further pumping out to surface. This prevents penetration of mine water through fissures to ground surface soil. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROTECTION OF UNDERGROUND WORKINGS AND SURFACE SOIL FROM FOULING WITH MINE WATER | 1997 |
|
RU2126484C1 |
METHOD FOR PRESERVING SURFACE IN UNDERGROUND MINING OF COAL | 1996 |
|
RU2096616C1 |
PROCESS CONTROLLING ROOF | 2000 |
|
RU2184241C2 |
METHOD FOR EXTRACTING THICK STEEP COAL SEAM BY HORIZONTAL DESCENDING LAYERS WITH COMPLETE FILLING OF WORKED-OUT SPACE | 1997 |
|
RU2135771C1 |
METHOD OF LEAVING OF BARREN ROCKS IN COAL MINE IN BARRIER STOPING | 1996 |
|
RU2100604C1 |
METHOD FOR PROTECTION FROM RADON EMANATION OF COAL SEAM AT ITS UNDERGROUND MINING | 1997 |
|
RU2116444C1 |
METHOD FOR ROOF CONTROL AT LAYER-BY-LAYER EXTRACTION OF THICK FLAT-LYING COAL SEAM | 1996 |
|
RU2096619C1 |
METHOD OF MINING OF THICK GENTLY DIPPING SEAM BY SHORT FACES IN DIAGONAL LAYERS | 1998 |
|
RU2147682C1 |
METHOD OF PROTECTION OF MINE ACQUISITION LAND USED FOR RICE PLANTING | 1998 |
|
RU2157891C2 |
METHOD FOR PRESERVATION OF EARTH SURFACE AT UNDERGROUND MINING OF COAL | 1997 |
|
RU2124636C1 |
Authors
Dates
1999-03-10—Published
1997-01-27—Filed