FIELD: construction. SUBSTANCE: method is realized as follows. Crosspiece with tie-rod suspended from it is mounted on column end face. Hydraulic jack made with clamps mounted in body is positioned on crosspiece tie-rod. The latter is passed through hydraulic jack and fixed by clamps. Floor construction is secured to hydraulic jack body. Constructions are lifted by stepped movement of hydraulic jack with construction relative to tie-rod. EFFECT: simplified mounting of equipment, reduced labor consumption. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ERECTION OF BUILDING WITH PRESTRESSED FRAME BY METHOD OF RISE OF STORIES | 2001 |
|
RU2199633C2 |
METHOD FOR RECONSTRUCTION OF BUILDING | 1995 |
|
RU2085679C1 |
METHOD FOR ERECTION OF BUILDING COVERING BY RAISING PROCEDURE | 1997 |
|
RU2119028C1 |
METHOD FOR ERECTION OF MULTISTORY FRAMEWORK BUILDING | 1998 |
|
RU2137886C1 |
DEVICE FOR TENSIONING AND FIXING OF REINFORCEMENT | 1998 |
|
RU2132431C1 |
METHOD OF TENSIONING OF THE STEEL WITH ANCHOR SLEEVE | 1995 |
|
RU2098572C1 |
METHOD OF TENSIONING FITTING WITH ANCHOR | 1992 |
|
RU2037041C1 |
METHOD FOR REBUILDING MULTISTORIED RESIDENTIAL BUILDING | 1997 |
|
RU2120009C1 |
METHOD OF BUILDING UPDATING | 1998 |
|
RU2149964C1 |
METHOD FOR RECONSTRUCTION OF BUILDING | 1996 |
|
RU2101438C1 |
Authors
Dates
1999-05-27—Published
1997-12-18—Filed