FIELD: heating systems. SUBSTANCE: boiler has water supply and discharge headers located above parallel tube bundles; dispensing tubes are laid coaxially inside uptake blind tubes; multisectional (multipassage) gas duct is also provided; each passage of gas duct is equipped with controllable dampers on one of respective sides over periphery of heated tubes; dampers are used for parallel and/or series connection of respective passages with furnace chamber. Load of boiler may be increased by two times with fan in operation and by several times during operation by chimney effect which is achieved through change of damper position. EFFECT: increased productivity; extended range of effective operation; reduction of thermal stresses; ease in cleaning and maintenance. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
AIR HEATER | 1998 |
|
RU2187772C2 |
BOILER PLANT | 1994 |
|
RU2086849C1 |
FLOATING WINDMILL-ELECTRIC GENERATING PLANT | 1998 |
|
RU2173280C2 |
S & S STEAM BOILER | 1997 |
|
RU2155909C2 |
METHOD OF DETERMINATION OF GAS CONTENT OF SOLUTION AND DEVICE FOR REALIZATION OF THIS METHOD | 1997 |
|
RU2187089C2 |
HOT WATER BOILER | 1993 |
|
RU2018060C1 |
METHOD AND APPARATUS FOR THERMAL TREATMENT OF FOOD PRODUCTS IN THE PROCESS OF OBTAINING CANNED FOODS FROM FROZEN RAW MATERIAL | 2000 |
|
RU2179808C2 |
HOT-WATER BOILER | 2001 |
|
RU2187763C1 |
COMBINED-CYCLE PLANT | 1995 |
|
RU2100619C1 |
SYSTEM OF WET SPARK QUENCHING OF EFFLUENT GASES OF POWER PLANT | 1996 |
|
RU2135266C1 |
Authors
Dates
1999-06-20—Published
1994-08-16—Filed