FIELD: shipbuilding; methods of manufacture and launching of reinforced concrete floating modules. SUBSTANCE: method includes building operations performed in dock and bringing the module into water area by means of buoyant reservoirs. Building operations include molding two reinforced concrete structures in horizontal forms which are symmetrically located relative to dock CL and are supported by means of hinges by upper edges of parallelepiped supports mounted on dock bottom. Then forms are shifted to vertical position together with molded module, after which reinforced concrete structures are connected by means of tie and forms are shifted to walls of dock chamber over guides; then dock is flooded and buoyant reservoirs are secured on walls of module. EFFECT: ease of manufacture; increased productivity. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING A HULL OF A FLOATING FACILITY (VERSIONS) | 2019 |
|
RU2726347C1 |
METHOD OF BUILDING LARGE-SIZE FLOATING STRUCTURES | 1992 |
|
RU2032586C1 |
METHOD FOR CONSTRUCTION OF FLOATING FACILITY, PREDOMINANTLY RIVER OR SEA VESSEL | 2011 |
|
RU2483965C1 |
0 |
|
SU1781384A1 | |
FOUNDATION ENVELOPE OF FLOATING BLOCK INSTALLED AT WATER AREA BOTTOM USING FLOAT-ON METHOD | 2011 |
|
RU2473739C1 |
METHOD FOR SETTING OF FLOATING BRIDGE | 1995 |
|
RU2086728C1 |
METHOD FOR CONSTRUCTION OF TRANSPORT TUNNEL OF TRANSITION | 2015 |
|
RU2586345C2 |
SHIP RE-EQUIPMENT | 2012 |
|
RU2532668C2 |
PROCESS OF ERECTION OF LARGE-BLOCK STRUCTURE IN COASTAL ZONE OF WATER BASIN AND FLOATING COMPLEX FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2195531C1 |
METHOD OF INSTALLATION OF SUPPORT PILLARS OF SELF-LIFTING DRILLING SEA PLATFORM | 0 |
|
SU1030489A1 |
Authors
Dates
1999-08-27—Published
1998-10-19—Filed