FIELD: transport.
SUBSTANCE: suggested invention relates to ship building and concerns manufacturing of hulls for river and sea vessels of concrete or reinforced concrete. Suggested method for construction of floating facility provides for preliminary selection of type and ensuring availability of floating facility the hull structure of which meets requirements placed on casing for concrete works. The said floating facility is arranged in displacing position. Feed, distribution and compacting of concrete mixture is provided into cavities formed by hull structure elements of the said floating facility thus forming concrete or reinforced-concrete hull of floating facility.
EFFECT: higher technological effectiveness of river and sea vessels hull construction of concrete or reinforced concrete.
8 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING A HULL OF A FLOATING FACILITY (VERSIONS) | 2019 |
|
RU2726347C1 |
METHOD OF MAKING WATER DISPLACEMENT CONCRETE ARTICLES | 2018 |
|
RU2699462C1 |
METHOD FOR FORMATION OF CLOSED SECTION OF WATER AREA BOTTOM WITH POSSIBILITY OF ITS DRYING AND SYSTEM, WHICH REALISES IT | 2008 |
|
RU2382142C2 |
OFFSHORE MOBILE AERODROME COMPLEX | 2012 |
|
RU2545140C2 |
METHOD FOR MANUFACTURING A GRAVITY-TYPE BASE (GTB) AT A SPECIALIZED PRODUCTION SITE | 2022 |
|
RU2771197C1 |
METHOD OF MANUFACTURE OF REINFORCED CONCRETE FLOATING MODULE | 1998 |
|
RU2135384C1 |
METHOD FOR CONSTRUCTION OF REINFORCED CONCRETE DECK INTERSECTION WITH LARGE SPAN | 2013 |
|
RU2522712C1 |
METHOD FOR ERECTION OF OBJECTS | 2008 |
|
RU2360826C1 |
TRANSFER FLOATING DOCK | 0 |
|
SU1219448A1 |
0 |
|
SU1781384A1 |
Authors
Dates
2013-06-10—Published
2011-12-27—Filed