FIELD: foundation building, applicable in erection mainly in winter season of bore-injection piles in season frozen grounds. SUBSTANCE: a bore hole is made in the ground, it is filled with cement-sound mortar up to the level of ground freezing, and a reinforced- concrete member with a through hole in length and with reinforcement projecting on its ends is immersed in the remaining part of the bore hole up to full immersion of the lower reinforcement in the cement-sand mortar. After that, in a fixed position of the reinforced - concrete member, mould pressing of the bore hole is performed by additional feeding of mortar under pressure through the hole in the member. Anti-swelling protection may be made is swelling grounds on the lateral surface of the member and/or bore-hole wall to the depth of ground freezing. EFFECT: reduced cost of manufacture in winter of a strong bore-injection pile in season frozen grounds. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CAST-IN-PLACE PILE MAKING | 2000 |
|
RU2193625C2 |
COMBINED METHOD FOR CAST-IN-PLACE PILE PRODUCTION | 2003 |
|
RU2244066C1 |
CAST-IN-PLACE PILE FORMING METHOD | 2004 |
|
RU2256029C1 |
PROCESS OF INSULATION OF STRUCTURES EXPOSED TO MOISTURE | 2001 |
|
RU2206675C2 |
METHOD FOR CAST-IN-PLACE PILE FORMING | 2003 |
|
RU2255179C1 |
METHOD OF TREATING WOODEN PILE BASE WITH ANTI-HEAVING COATING | 2023 |
|
RU2826072C1 |
METHOD FOR INCREASING THE HEAVING PROTECTION PROPERTIES OF THE STUD | 2021 |
|
RU2763489C1 |
WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS | 2023 |
|
RU2822185C1 |
PROCEDURE EVALUATING QUALITY OF HYDRAULIC INSULATION | 2001 |
|
RU2203481C2 |
MANUFACTURING METHOD OF INCLINED PILE WITH CONTROLLED WIDENING | 2012 |
|
RU2522358C1 |
Authors
Dates
2000-06-10—Published
1999-01-25—Filed