FIELD: construction, particularly for erecting new buildings or reconstructing existent ones.
SUBSTANCE: method involves drilling well, filling well with hardening material having gel-forming additive previously mixed with it; installing working discharger in hardening material of pile body and performing high-voltage discharges simultaneously with moving discharger along pile body. Gel-forming additive converts liquid component of concrete mix from liquid state into viscous one to prevent forcing the liquid component into ground surrounding the pile under the action of hydroelectric impulses.
EFFECT: increased efficiency of hydroelectric technology usage and improved pile load-bearing ability.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CAST-IN-PLACE PILE MAKING | 2000 |
|
RU2193625C2 |
COMBINED METHOD FOR CAST-IN-PLACE PILE PRODUCTION | 2003 |
|
RU2244066C1 |
METHOD FOR PRODUCING CAST-IN-PLACE PILES | 1993 |
|
RU2039156C1 |
METHOD OF PILE PRODUCTION | 2017 |
|
RU2654097C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
METHOD OF PRODUCING CAST-IN-PLACE PILES | 1997 |
|
RU2117726C1 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2318960C2 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
CAST-IN-PLACE PILE FORMING METHOD | 2003 |
|
RU2250957C2 |
Authors
Dates
2005-07-10—Published
2004-08-23—Filed