FIELD: oil and gas production. SUBSTANCE: in a method of performing deep anode grounding including drilling borehole, placing metal conductor in borehole and filling borehole from bottom zone to head with conducting nonmetallic material, the latter is conducting cement mortar. Mortar is laid into hole by vertically displacing tube technique and metal conductor is positioned in non-hardened conducting cement mortar in head zone of hole. Injection tube or reinforcing steel bar can be used as metal conductor. EFFECT: increased lifetime of anode. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR ANODE EARTHING | 2009 |
|
RU2394942C1 |
PLUGGING MATERIAL FOR HIGH-TEMPERATURE WELLS | 2000 |
|
RU2198999C2 |
PROCESS OF CONSTRUCTION OF BASE FOR CLUSTER OF WELLS ON PERMAFROST | 1999 |
|
RU2166586C2 |
EXPANDABLE OIL-WELL CEMENT | 1997 |
|
RU2153059C2 |
ANODE GROUNDING ELECTRODE | 1998 |
|
RU2149920C1 |
METHOD OF OPERATION OF OIL AND OIL-GAS WELLS | 2001 |
|
RU2212523C2 |
CATHODIC PROTECTION SYSTEM FOR TRUNK PIPELINES | 1999 |
|
RU2202001C2 |
DEVICE FOR RESISTIVE GROUNDING OF HIGH-VOLTAGE LINE NEUTRAL (ALTERNATIVES) | 2003 |
|
RU2260891C2 |
REDUCED HEAT REMOVAL INTERNAL COMBUSTION ENGINE AND METHOD OF ITS MANUFACTURE | 1996 |
|
RU2168039C2 |
COMMUNICATION UNIT FOR REMOTE CONTROL OVER PIPE-LINE CHANNEL | 1997 |
|
RU2170952C2 |
Authors
Dates
2000-07-27—Published
1998-02-18—Filed