FIELD: civil engineering. SUBSTANCE: two devices moved by flow of pumped over product are introduced into pipeline. Devices are provided with sealing, braking and stopping systems. Control systems are positioned at preset points above pipeline. With devices approaching place of repair, motion speed is reduced by means of braking system and by opening of flow by-pass system. Control system gives commands for braking, flow by-pass, device stopping, pipeline sealing, and product pumping-out. EFFECT: enlarged store of process facilities. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR REVEALING AND RECORDING POSITION OF INWARDS PROJECTING DEFECTS AND OBSTACLES IN PIPELINE | 1999 |
|
RU2148205C1 |
DEVICE FOR CLEANING INTERNAL SURFACES OF PIPE-LINE | 2000 |
|
RU2176163C1 |
DEVICE FOR CUTTING-OUT AND REMOVAL OF DEFECTIVE SECTIONS IN OPERATING PIPE LINE | 1997 |
|
RU2133400C1 |
METHOD OF REVEALING FAULTS PROJECTING INSIDE PIPE LINE AND INTERFERING WITH MOTION OF CLEANING AND DIAGNOSIS MEDIUM THROUGH PIPE LINE AND DEVICE FOR REALIZATION OF THIS METHOD | 1992 |
|
RU2088839C1 |
DEVICE TO LOCATE CLEANING AND DIAGNOSTIC TOOLS IN PIPE-LINE | 1996 |
|
RU2110729C1 |
DEVICE FOR CHECK OF MOTION OF CLEANING AND DIAGNOSTIC OBJECTS IN PIPE LINE | 1997 |
|
RU2137977C1 |
PIPE LINE FLAW DETECTOR | 1993 |
|
RU2084757C1 |
DEVICE FOR CLEANING OF PIPELINE INTERNAL SURFACE | 2000 |
|
RU2191077C2 |
DEVICE FOR CHECKING DISTANCE BETWEEN EXCAVATOR BUCKET AND PIPELINE WALL SURFACE | 1997 |
|
RU2140493C1 |
BRANCH PIPE SHUTOFF DEVICE | 2012 |
|
RU2497039C1 |
Authors
Dates
2000-12-10—Published
1999-07-06—Filed