FIELD: oil-and-gas industry. SUBSTANCE: proposed method includes delivery of hotter well production via inner tubing string and delivery of colder well production via outer tubing string. Sectional rising tube is mounted in well. Short rising tube is lowered inside sectional tubing string; it is coupled in disconnector of tubing string, thus forming extension of lower portion of sectional tubing string over internal diameter. production from lower hotter stratum is withdrawn over lower portion of tubing string and then through disconnector and short tubing string; production of upper colder stratum is with drawn through filter to circular space between short and sectional tubing strings. production of colder stratum is delivered to wellhead via separate loop for production preparation unit. EFFECT: reduction of heat flow taken up by heat insulation. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL OPERATION METHOD | 2003 |
|
RU2254461C1 |
METHOD OF OPERATION OF OIL AND OIL-GAS WELLS | 2001 |
|
RU2212523C2 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
METHOD OF CONSTRUCTING COASTAL MULTI-HOLE GAS WELL FOR DEVELOPMENT OF SHELF DEPOSIT | 2015 |
|
RU2602257C2 |
PROCESS OF WELL ABANDONMENT | 2002 |
|
RU2222687C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
EQUIPMENT FOR DUAL BED OPERATION FOR OIL- AND GAS-BEARING FORMATIONS IN WELL | 2014 |
|
RU2572041C2 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
Authors
Dates
2001-01-27—Published
2000-06-19—Filed