FIELD: construction engineering. SUBSTANCE: method involves earth excavation near top parts of piles, cutting of their parts affected by decay, and formation of grill. Novelty is that dry ground-cement mix is placed between remaining parts of piles and reinforced concrete foundation grill and reinforced in level-by-level manner with roll material. Powder preservative is added to bottom layer of ground-cement. EFFECT: reduced cost; facilitated reconstruction; provision for round-the-year work. 1 cl, 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF TREATING WOODEN PILE BASE WITH ANTI-HEAVING COATING | 2023 |
|
RU2826072C1 |
| WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS | 2023 |
|
RU2822185C1 |
| METHOD OF CONSTRUCTING DEEP FOUNDATIONS AND DEEP FOUNDATION | 2017 |
|
RU2698783C2 |
| METHOD TO ERECT COMBINED PILE AND ITS DESIGN | 2011 |
|
RU2486315C2 |
| DEVICE FOR PILE FOUNDATION FOR MACHINES WITH DYNAMIC LOADS AND VIBRATION-SENSITIVE EQUIPMENT | 2019 |
|
RU2728077C1 |
| FOUNDATION STRUCTURE FOR BUILDING AND BUILDING STRUCTURE | 2003 |
|
RU2256033C2 |
| FOUNDATION OF RECONSTRUCTED BUILDING | 2010 |
|
RU2431718C1 |
| UNDERGROUND CHANNEL FOR LAYING PIPELINES IN STRONGLY COMPRESSIBLE GROUND | 2002 |
|
RU2258783C2 |
| HEAT-INSULATING PILE FOUNDATION | 2022 |
|
RU2820318C2 |
| METHOD FOR SLAB-AND-PILE FOUNDATION ERECTION | 2006 |
|
RU2305154C1 |
Authors
Dates
2001-04-27—Published
1999-12-22—Filed