FIELD: methods of operations in hydraulic engineering and methods of construction of dumps for wastes of oil and gas production in well cluster drilling and well operation. SUBSTANCE: method includes marking of boundaries and configuration of land allocations, pouring off or washing up ground, hydraulic proofness of process area, external embankment of process area peripheries, location of production and consumption wastes on territory of area between external and internal embankments which are made round positions of abandoned wells. EFFECT: efficient use of land resources, reduced harmful effect on environment. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECULTIVATION OF EARTH WAREHOUSE | 2002 |
|
RU2245352C2 |
METHOD OF A STORAGE BARN RECULTIVATION | 2003 |
|
RU2251564C2 |
METHOD OF RECULTIVATION OF CONTAMINATED GROUNDS | 1999 |
|
RU2160642C1 |
METHOD FOR DISMOUNTING EARTH STORAGES | 1999 |
|
RU2170304C2 |
METHOD FOR CONSTRUCTION OF OIL AND GAS WELL ON LAND | 2019 |
|
RU2723794C1 |
METHOD OF RECULTIVATING DISTURBED LAND UPON TERMINATING CONSTRUCTION OF WELL | 1999 |
|
RU2158070C1 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
METHOD FOR LIQUIDATION OF GROUND STORAGE-COLLECTOR OF DRILLING WASTE | 1997 |
|
RU2123574C1 |
METHOD FOR CONSTRUCTION OF COLLECTING PIT | 1997 |
|
RU2144112C1 |
METHOD OF DRILLING MUD UTILISATION | 2010 |
|
RU2439098C2 |
Authors
Dates
2002-07-10—Published
2000-11-30—Filed