FIELD: fast reactors. SUBSTANCE: telescopic joint is exposed to alternating magnetic field, response signal is picked up and used to determine changes in magnetic reluctance of adjacent sections in telescopic joint; amount of overlap is found by space between these changes; frequency of alternating magnetic field acting on telescopic joint is 50-500 Hz. EFFECT: provision for direct overlap check without extracting and replacing process channel. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING OVERLAPPING VALUE OF TELESCOPIC JOINT OF UPPER PATH WITH FLANGE OF GRAPHITE COLUMN OF CHANNEL NUCLEAR REACTOR, AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2400839C1 |
METHOD FOR EVALUATING DEGREE OF ENGAGEMENT BETWEEN TELESCOPIC JOINT OF UPPER PATH AND GRAPHITE COLUMN FLANGE OF PRESSURE-TUBE REACTOR | 2004 |
|
RU2273899C2 |
METHOD FOR DETECTING DEFECTIVE ARTICLES | 1991 |
|
RU2037818C1 |
APPARATUS FOR CHOPPING SPENT FUEL CHANNELS FROM URANIUM-GRAPHITE REACTORS | 1995 |
|
RU2079908C1 |
METHOD AND DEVICE FOR CHECKING GAS GAP IN PROCESS CHANNEL OF URANIUM-GRAPHITE REACTOR | 2003 |
|
RU2246144C2 |
METHOD FOR RECOVERING SERVICEABILITY OF EXPANSION DEVICE IN PROCESS CHANNEL OF URANIUM-GRAPHITE REACTOR | 1996 |
|
RU2105358C1 |
REPAIR METHOD FOR GRAPHITE BLOCKS OF PRESSURIZED-TUBE NUCLEAR REACTOR | 1993 |
|
RU2083003C1 |
SUPPORTING INSERT FOR RECOVERING VERTICAL COMPENSATING CAPACITY OF NUCLEAR REACTOR GRAPHITE STACKING AND TOOL FOR ITS INSTALLATION | 1996 |
|
RU2117340C1 |
FACILITY FOR CUTTING PROCESS CHANNELS OF URANIUMGRAPHITE REACTORS INTO FRAGMENTS | 2000 |
|
RU2172988C1 |
METHOD FOR EXTRACTING PROCESS CHANNEL FROM URANIUM-GRAPHITE REACTOR | 1995 |
|
RU2089946C1 |
Authors
Dates
2002-07-10—Published
2000-12-08—Filed