FIELD: mechanized assembling of track sections. SUBSTANCE: invention can be used in flow lines. Proposed device has feeding accumulation conveyor made in form of two parallel smooth chain, receiving conveyor with tie grips uniformly spaced lengthwise the conveyor chains, and tie cutoff mechanism mounted between said conveyors and mechanically coupled with receiving conveyor. Short-length smooth conveyor is arranged in zone of location of tie cutoff mechanism. Speed of this conveyor is higher than that of feeding accumulation conveyor. Inclined slide is mounted in zone of intersection of short-length conveyor with runs of feeding accumulation conveyor. Front cut of slide projects over chain of short-length conveyor. Slide is installed at a distance from tie cutoff-mechanism equal to width of tie. Drive of short-length conveyor is made in form of large diameter sprocket installed on conveyor drive shaft. EFFECT: improved efficiency of flow line and reliability of transfer mechanism. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOW LINE FOR DEEP PRICKING OF TIES | 2000 |
|
RU2184650C2 |
FLOW LINE FOR ASSEMBLY OF RAIL-AND-SLEEPER GRID LINKS IN RAILWAY TRACK | 2008 |
|
RU2373320C1 |
FLOWLINE FOR PRICKING OF TIES AND PREVENTING THEIR CRACKING | 2003 |
|
RU2249645C1 |
PRODUCTION LINE FOR PACKING IMPREGNATED SLEEPERS | 2003 |
|
RU2245245C1 |
SLEEPER FEEDER OF LINK-ASSEMBLING LINE | 2009 |
|
RU2410483C1 |
FLOW LINE FOR TIE SPIKES AND ANTI-CRACK BINDING | 2007 |
|
RU2336995C1 |
WOODEN TIE SORTING AND PACKAGING DEVICE | 1997 |
|
RU2130420C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
MOBILE DEVICE FOR REINFORCED CONCRETE PALES INSTALLATION BASED ON EPURE AND "CORD" | 2008 |
|
RU2376411C1 |
METHOD OF AND DEVICE FOR FASTENING OF TIES WITH PREVENTION OF THEIR CRACKING | 1999 |
|
RU2181810C2 |
Authors
Dates
2002-08-10—Published
2000-07-19—Filed