FIELD: construction, road engineering.
SUBSTANCE: invention is related to the field of railway transport equipment mechanisation and may be used in assembly of rail-and-sleeper grid links on production bases of track machine stations. Flow line for assembly of links of railway track rail-and-sleeper grid comprises parallel direct and reverse flows of wagon-pallets, which are arranged on guides and are not related to each other, transfer devices arranged in the ends of flows and closing them to each other, mechanisms for longitudinal displacement of wagon pallets, process equipment arranged along with the flows and including tie layer with conveyor for issue of tie row cut from packet of ties. Tie layer is equipped with movable lift table for tie transfer from conveyor to wagon pallet. Mechanism for longitudinal displacement of wagon pallet arranged in the zone of tie layer installation, is provided with the possibility to support displacement of wagon pallet by epure pitch.
EFFECT: invention provides for laying of ties along epure of assembled link directly from packet of ties fed to the line.
4 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
FLOW LINE FOR ASSEMBLING RAILWAY TRACK SECTIONS | 2004 |
|
RU2260089C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2006 |
|
RU2304191C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
FLOW LINE FOR ASSEMBLING TRACK SKELETON MEMBERS | 2003 |
|
RU2268333C2 |
FLOW LINE TO ASSEMBLE RAIL LENGTHS | 2009 |
|
RU2410484C2 |
METHOD TO ASSEMBLE RAIL LENGTHS IN UNPADDED TYPE OF JOINTS | 2010 |
|
RU2437979C1 |
FLOW LINE FOR DISASSEMBLING RAILWAY SKELETONS | 1997 |
|
RU2116398C1 |
Authors
Dates
2009-11-20—Published
2008-04-21—Filed