FIELD: thermal engineering; designing new and updating existing steam- turbine installations. SUBSTANCE: cycle scheme of steam-turbine unit is set up of boiler coupled through steam line with turbine incorporating regenerative heaters and condenser and second boiler coupled through steam line with second turbine including regenerative system and delivery water boiler. Delivery-water line running to second-turbine boiler is connected through pipeline to first-turbine condenser and delivery-water outlet line running from second-turbine boiler is coupled through pipeline condensate supply line to first- turbine regenerative heaters. EFFECT: enlarged functional capabilities; provision for round-the-year continuous operation of existing equipment with high economic efficiency. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
STEAM-TURBINE UNIT CYCLE ARRANGEMENT | 2003 |
|
RU2252321C1 |
STEAM TURBINE PLANT | 2013 |
|
RU2517974C1 |
STEAM-TURBINE THERMAL POWER PLANT OPERATING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2432468C1 |
STEAM-TURBINE PLANT | 2001 |
|
RU2192547C1 |
START-UP, OPERATION AND LOAD-RELIEF METHOD OF COMBINED HEAT-AND-POWER PLANT, AND DEVICE FOR METHOD'S REALISATION | 2006 |
|
RU2350758C2 |
METHOD OF OPERATION OF STEAM TURBINE THERMOELECTRIC PLANT WITH GAS-TURBINE SET | 2005 |
|
RU2277639C1 |
THERMOELECTRIC PLANT WITH GAS-TURBINE UNIT | 2005 |
|
RU2280768C1 |
MAIN ELECTRICAL AND HEATING LINE WITH OPEN THERMAL SYSTEM | 2004 |
|
RU2259486C1 |
MAIN ELECTRIC AND HEATING LINE WITH CLOSED THERMAL SYSTEM | 2004 |
|
RU2259485C1 |
POWER AND HEATING PLANT WITH OPEN POWER AND HEAT SUPPLY SYSTEM | 2004 |
|
RU2261337C1 |
Authors
Dates
2002-09-20—Published
2001-11-13—Filed