FIELD: construction. SUBSTANCE: the production line has proportioning hoppers connected to a mortar mixer for delivery of aggregate and binder, vessel connected to the water conduit for water supply and a finished product receiving hopper. The hopper for delivery of aggregate is connected to a crusher and a screen connected to each other for preliminary grinding and fractionation of the source rock. In addition the production line has a tank for water saturation of aggregate and a settler, which are successively in stalled between the hopper for delivery of aggregate and the mortar mixer. A ball mill is installed between the crusher and the screen. The screen is connected to the ball mill for return of coarse aggregate fractions to the production cycle. The water saturation tank is connected to the water conduit. The settler is connected to the water supply vessel. EFFECT: simplified procedure of preparation of mortar. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MORTAR PREPARATION FLOW LINE | 2000 |
|
RU2189902C2 |
METHOD FOR PREPARATION OF CONCRETE MIX AND PROCESS LINE FOR ITS REALISATION | 2007 |
|
RU2351469C2 |
PROCESSING LINE FOR MANUFACTURING OF CONSTRUCTIONAL PRODUCTS | 1991 |
|
RU2033323C1 |
TECHNOLOGICAL LINE FOR PRODUCTION OF CONSTRUCTION ARTICLES | 1995 |
|
RU2118565C1 |
TECHNOLOGICAL LINE FOR PRODUCING CONCRETE MIXTURE | 2021 |
|
RU2766987C1 |
CONTINUOUS LARGE-POROUS CONCRETE PRODUCTS PRODUCTION LINE | 2018 |
|
RU2716627C1 |
APPARATUS FOR PRODUCTION OF LOW-WATER CONSUMPTION BINDER | 1993 |
|
RU2033327C1 |
FLOW LINE FOR MAKING SILICA BRICK | 0 |
|
SU1052390A1 |
PROCESSING LINE FOR THE PRODUCTION OF GLASS-DOLOMITE SHEETS | 2021 |
|
RU2772474C1 |
ACTIVATED MINERAL POWDER FOR ASPHALT-CONCRETE MIX | 1997 |
|
RU2120922C1 |
Authors
Dates
2002-09-27—Published
2000-06-20—Filed