FIELD: mining; applicable in deep excavation by walking excavators of barren rocks of placer and bedded deposits. SUBSTANCE: method includes rock excavation from pit by excavator in front and side faces and storage of rocks into flat dump with excavator traveling along face. Rocks from pit are excavated in two stages. First, upper layer of rock is excavated with excavator moving along face toward formed dump. Then, in backward moving of excavator over the same path, lower layer of rock is excavated. Then rock is excavated from the next face with excavator traveling over path parallel to previous one. EFFECT: higher productivity of excavation and reduced cost of stripping operations. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEPOSIT BULLDOZER STRIPPING | 2002 |
|
RU2212537C1 |
METHOD OF SHALLOW DEPOSITS STRIPPING | 2001 |
|
RU2195555C1 |
METHOD FOR DRAINAGE DEVELOPMENT OF PLACERS | 2018 |
|
RU2681168C1 |
METHOD OF OVERBURDEN OPERATIONS | 1996 |
|
RU2108462C1 |
METHOD FOR OPEN EXTRACTION OF BED-LIKE DEPOSITS | 2003 |
|
RU2254476C1 |
DEVELOPMENT METHOD OF KIMBERLITE DEPOSITS | 2008 |
|
RU2384706C1 |
DIRECT MINING METHOD | 2013 |
|
RU2537309C1 |
METHOD TO MINE BED DEPOSITS | 2012 |
|
RU2490464C1 |
METHOD OF TIERED GRAVEL DEPOSIT MINING BY CONTINENTAL BUCKET DREDGES | 2006 |
|
RU2330957C1 |
PROCESS OF DEVELOPMENT OF STEEPLY DEEPING DEPOSITS WHILE WORKING DEEP FLOORS IN STRIPPING | 2001 |
|
RU2200841C2 |
Authors
Dates
2002-11-27—Published
2001-02-19—Filed