FIELD: bridge construction, removal of moisture from mass of bridge structure and from roadway of bridge structure. SUBSTANCE: facility includes drain tubes installed in plate of bridge structure with formation of drain recesses above each tube which are located in mass of lower layer of pavement lying directly on hydraulic insulation layer. Novelty of approach consists in that drain recesses form longitudinal drain conduit filled with drain mixture comprising crushed stone and binder with formation of porous structure. Drain tubes are positioned under drain conduits. EFFECT: removal of moisture from mass of pavement of bridge structure and as result prolonged service life of pavement. 6 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCING BRIQUETTES FOR DRAINAGE SYSTEM | 2013 |
|
RU2521253C1 |
PROCESS WIDENING BRIDGE STRUCTURE | 2001 |
|
RU2205914C1 |
REINFORCEMENT METHOD OF A BRIDGE STRUCTURE WITH DISMANTLING OF BRIDGE CHANNEL SUPPORTS | 2019 |
|
RU2712984C1 |
METHOD OF STABILIZING TEMPERATURE MODE OF ROAD SURFACE AND ROADWAY OF BRIDGE STRUCTURE | 2023 |
|
RU2814378C1 |
METHOD TO EXPAND BRIDGE STRUCTURE USING CABLE SYSTEM | 2013 |
|
RU2539461C1 |
ANCHORAGE FOR SECURING BRIDGE FRAMEWORK TO BRIDGE FOOTING | 2002 |
|
RU2209869C1 |
METHOD FOR TRANSVERSE RELOCATION OF BRIDGE SUPERSTRUCTURE FOR EXTENDED COLLAR BEAM | 2014 |
|
RU2557020C1 |
MULTILAYER MAT FOR DEVICE OF ROAD EMBANKING AND METHOD FOR ITS MANUFACTURE | 2023 |
|
RU2802766C1 |
METHOD FOR DISASSEMBLY OF ARCH BRIDGE | 2022 |
|
RU2800582C1 |
BRICKS OF BITUMEN MASS AND METHOD OF THEIR MANUFACTURE | 2016 |
|
RU2645482C1 |
Authors
Dates
2003-06-10—Published
2001-12-18—Filed