FIELD: construction industry, repair and reconstruction of existing buildings and structures, predominantly under conditions of crowded city conditions. SUBSTANCE: reinforcing construction for foundation and footing of existing structure in the form of drilled-in and injection piles includes row of inclined piles passing through foundation on its inside. Novelty of approach lies in that construction includes vertical piles arranged on outside of structure over its perimeter and vertical piles arranged in rows over area of basement of structure. EFFECT: enhanced reliability of fixing and hydraulic insulation of foundation mass and ground in footing of existing structures. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE OF REINFORCEMENT OF FOUNDATION AND FOOTING OF EXISTING CONSTRUCTION STRUCTURES | 2001 |
|
RU2211289C2 |
METHOD FOR RECONSTRUCTION OF BUILDINGS, CONSTRUCTIONS | 1993 |
|
RU2065001C1 |
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) | 2014 |
|
RU2562359C2 |
INJECTION PILE AND RETAINING WALL BUILT OF PILE FOUNDATION | 2004 |
|
RU2281997C2 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
GROUTING MORTAR | 2001 |
|
RU2211304C1 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
MULTI-FUNCTIONAL STRUCTURE | 2012 |
|
RU2511067C1 |
METHOD FOR STRUCTURE ERECTION BETWEEN ENDS OF EXISTENT BUILDINGS | 2005 |
|
RU2293830C1 |
Authors
Dates
2003-08-27—Published
2001-11-28—Filed