FIELD: construction.
SUBSTANCE: method of two-lane tunnel construction comprises tunneling using tunnel-boring mechanized complex, installation of a formwork for the construction of a ventilation slab, erection of a rigid tunnel base. A multi-level assembling trolley of portal construction supported by rollers is connected to the tunnel-boring mechanized complex, utility systems are erected at the planned height during tunneling and formwork for the ventilation slab construction is installed using the trolley. When erecting the rigid tunnel base, lateral concrete protrusions are constructed, a handling trolley is moved along them, the trolley consists of two ramps and a transport rack supported by metal slides, is intended for crossing the work area for laying the central part of the rigid base by a multiservice vehicle which runs under the multi-level assembling trolley, delivering materials and lining blocks to the tunnel-boring mechanized complex while tunneling. Construction of the ventilation slab and erection of the rigid tunnel base are carried out simultaneously with tunneling using the multi-level assembling trolley and the handling trolley.
EFFECT: reduced labour costs and reduced construction time of the two-lane tunnel due to the simultaneous performance of unrelated operations.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF TUNNEL INTERNAL STRUCTURES, COMPLEX FOR CONSTRUCTION OF TUNNEL INTERNAL STRUCTURES AND MOVABLE SCAFFOLDS | 2022 |
|
RU2801520C1 |
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) | 2014 |
|
RU2562359C2 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
METHOD FOR CONSTRUCTING A COLUMN OF A DEEP SUBWAY STATION | 2022 |
|
RU2785718C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
METHOD TO INSTALL SUBWAY LINES | 2012 |
|
RU2514865C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
METHOD FOR CONSTRUCTION OF METRO LINE USING TRENCHLESS METHOD WITH PERMANENT CROSS-SECTION CASING AND SINGLE TYPE OF TUNNEL-PENETRATING MECHANIZED COMPLEX | 2020 |
|
RU2754694C1 |
SUBWAY LINE IN DEEP URBAN AREAS | 2023 |
|
RU2808273C1 |
Authors
Dates
2017-07-11—Published
2016-05-24—Filed