FIELD: erection of permanent water-development works. SUBSTANCE: invention is related to erection of permanent water-development works in process of development and construction of shoal sections of water area, for instance, during excavation and deep processing of hydrocarbon raw materials, during construction of fish-breeding complexes, artificial islands, in particular. Floating reinforced concrete matrix pontoon fitted with plant preparing concrete solution and attachments for casting and mounting of piles, loaded with piles in the form of pipes is towed to site of erection of water-development works. Pipes are positioned vertically along two sides of reinforced concrete matrix pontoon in symmetry with its longitudinal axis. Concrete mixture is poured into spaces of pipes. Matrix pontoon is moved to new site and next group of piles is put along its two sides till formation of pile field is completed. Then base pontoons which width is equal to width of matrix pontoon are in turn brought into intervals between piles and each pontoon is made fast to piles bordering on it. Charge ballast is loaded into each base pontoon. Later payload is formed on base pontoons by positioning of production equipment and/or formation of landscape-architectural forms. Mounted floating reinforced concrete pontoon that can be detached is attached to one of free sides of base pontoon. EFFECT: simplified assembly, reduced time and labor input to erection of water-development works, enhanced functional reliability of these structures. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC STRUCTURE ON VERTICAL PILE BASE OF MODULAR STRUCTURE | 2018 |
|
RU2711973C1 |
METHOD FOR FORMATION OF CLOSED SECTION OF WATER AREA BOTTOM WITH POSSIBILITY OF ITS DRYING AND SYSTEM, WHICH REALISES IT | 2008 |
|
RU2382142C2 |
HYDRAULIC STRUCTURE WITH VERTICAL PROFILE ON PILE BASE AND METHOD OF ITS ERECTION | 2014 |
|
RU2568497C1 |
ARTIFICIAL ISLAND, ITS SUPPORT AND METHOD FOR ITS CONSTRUCTION | 2000 |
|
RU2159320C1 |
METHOD FOR CONSTRUCTION OF TRANSPORT TUNNEL OF TRANSITION | 2015 |
|
RU2586345C2 |
METHOD OF BRIDGE BUILDING OVER WATER BODY | 2004 |
|
RU2237123C1 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
METHOD OF CONSTRUCTING RECREATION COMPLEX ABOVE SEA AREA NEARBY UNUSED HIGH CLIFFED COAST WITH NO BEACHES | 2011 |
|
RU2474649C2 |
MARINE ICE-RESISTANT ADJUSTABLE PLATFORM MOUNTING SYSTEM AND METHOD FOR PLATFORM TRANSPORTATION AND MOUNTING BY MEANS OF MOUNTING SYSTEM | 2005 |
|
RU2309221C2 |
METHOD FOR ARRANGEMENT OF SHALLOW SUBWAY AT WATER AREA BOTTOM | 2008 |
|
RU2386755C1 |
Authors
Dates
2004-02-27—Published
2002-04-25—Filed