HYDRAULIC STRUCTURE WITH VERTICAL PROFILE ON PILE BASE AND METHOD OF ITS ERECTION Russian patent published in 2015 - IPC E02B3/06 E02B17/02 

Abstract RU 2568497 C1

FIELD: construction.

SUBSTANCE: method of construction of the structure includes the installation of the metal conductors (MC) and vertical piles with their subsequent immersion into water area bed ground, supply of concrete mix for formation of the bearing supporting framework in the form of the monolithic concrete block (MCB) 8. From the coast towards the high sea on underwater coastal slope into the ground 10 of the water area bed 11 on the structure axis MCs are installed permanently one by one which for the whole period of construction and operation of the structure are fixed. At first the first MC is permanently installed with external metal protection in the form of the flexible rod holding device (FRHD) forming internal space of MC it is filled with large stones or concrete figured elements 16, then at the distance 0.4-0.6 m from its external perimeter the formwork is installed. The concrete mix is supplied into the internal space fenced with the formwork and the first MC is made monolithic, except internal cavity of its vertical metal pipes (VMP) 2. The concrete mix is held until curing, and after achievement by concrete of pre-set strength in the internal space, fenced with formwork, the first monolithic concrete block (MCB) 8 is formed with the top mark 0.6-2.0 m with reference to the sea level which is a structure component. From the surface of the first MCB 8 through internal cavities of VMP 2 one by one the anchoring piles 7 are installed, moving them through the body of the first MCB 8 after its erection, and under it the anchoring pile base is formed which fixes the first MCB 8 from movement by wave influence after its erection. The top head part 12 of anchoring piles 7 in equal in strength manner and rigidly are fixed in the internal cavity of VMP 2 with the internal surface of these pipes by means of plate-type metal inserts. The gap between the piles and internal surface of metal pipes, and also head parts of piles in places of their fixing in internal cavities of VMP 2 is filled with fine-grained concrete to provide stability of MCB 8. At the distance 0.4-0.6 m from the first MCB 8 the following second MC is installed on water area bed with external metal fencing in the form of FRHD. The named operations of the method are performed similar to the construction of the first MCB 8. The second MCB 8 is formed with the top mark 0.6-2.0 m with reference to sea level. In the same sequence the construction of the following MCB 8 is performed until formation of the row of the monolithic concrete blocks 8 installed on the anchoring pile base and which are the components of the whole hydraulic structure with vertical profile. In the inverse sequence, starting from the last in the row MCB 8 installed on the anchoring pile base towards the coast the concrete or ferroconcrete superstructure 19 is erected on which if necessary the storm wall 20 is installed, and on the underwater coastal slope from various grounds, including from easily washed away incoherent soil, the stationary hydraulic structure with vertical profile on the anchoring pile basis is formed.

EFFECT: improvement of bearing ability of the structure, its strength, reliability and resistance to washout of base ground, and to storm impact.

4 cl, 7 dwg

Similar patents RU2568497C1

Title Year Author Number
HYDRAULIC STRUCTURE ON VERTICAL PILE BASE OF MODULAR STRUCTURE 2018
  • Androsov Nikolaj Anatolevich
  • Kalina Anatolij Anatolevich
RU2711973C1
GUARD BREAKWALL, MAINLY FOR YACHT PORTS 2009
  • Kushu Ehduard Khadzhimosovich
  • Bondarenko Vitalij Aleksandrovich
  • Natsvin Dmitrij Olegovich
RU2406799C1
METHOD FOR RECONSTRUCTING THE BERTH OF THE NAVAL BASE 2022
  • Dobryshkin Evgenij Olegovich
  • Kurashev Nikita Vladimirovich
  • Yakovlev Aleksej Vladimirovich
  • Borisova Darya Vladimirovna
RU2797793C1
BERTHING STRUCTURE 1996
  • Gorgutsa Ju.V.
  • Djachenko V.A.
  • Kljucharev N.D.
  • Zlatoverkhovnikov L.F.
  • Puzankov V.I.
RU2119004C1
PROTECTIVE CASE FOR BRIDGE PIER GRILLAGE AND ERECTION METHOD THEREOF 2004
  • Pavljukov Ju.A.
  • Velichko V.S.
  • Morozov V.N.
  • Likverman A.I.
RU2263176C1
PROTECTIVE BANK CONSOLIDATION STRUCTURE AND METHOD OF STRUCTURE ERECTION 2005
  • Lobov Oleg Ivanovich
  • Mel'Nikov Boris Nikolaevich
  • Ivanenko Viktor Ivanovich
  • Sherstjuk Sergej Leonidovich
RU2280730C1
ICE BERTH 2021
  • Kolosov Mikhail Aleksandrovich
  • Andreeva Sofiia Aleksandrovna
RU2764806C1
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE 2023
  • Kolyushev Igor' Evgen'Evich
  • Nikolaev Vasilij Evgen'Evich
  • Nikolaev Artem Aleksandrovich
  • Malan'In Aleksandr Viktorovich
  • Zimirev Oleg Nikolaevich
  • Malygin Evgenij Gennad'Evich
RU2807350C1
SHIP-RAISING CAST-IN-PLACE AND PRECAST CONSTRUCTION FOR SMALL-SIZE SHIPS AND METHOD OF ITS ERECTION 2013
  • Kushu Ehduard Khadzhimosovich
  • Bondarenko Vitalij Aleksandrovich
  • Kutts Aleksej Georgievich
  • Fedorova Svetlana Ivanovna
RU2524740C1
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA 2023
  • Konnykh Andrej Albertovich
  • Sukhorukov Aleksej Aleksandrovich
  • Romanov Dmitrij Vyacheslavovich
  • Kolyushev Igor Evgenevich
  • Lyutyj Sergej Mikhajlovich
  • Malygin Evgenij Gennadevich
RU2809049C1

RU 2 568 497 C1

Authors

Bondarenko Vitalij Aleksandrovich

Kushu Ehduard Khadzhimosovich

Natsvin Dmitrij Olegovich

Vinogradov Aleksandr Sergeevich

Kolbanov Oleg Vladimirovich

Dates

2015-11-20Published

2014-08-07Filed