FIELD: mining industry and building industry equipment. SUBSTANCE: method involves graining disrupted area; placing shuttering frame in quarry face toe depression; fixing shuttering frame into face toe depression by anchors; layer-by-layer filling shuttering frame space with concrete composition up to leveling with upper quarry face banquette; advance loading shuttering frame through layer thickness with crushed rock from lower banquette and then from upper banquette; waterproofing upper and lower banquettes after concrete setting-up; removing load. EFFECT: increased width and bearing strength of banquettes of disrupted high steep quarry face areas. 6 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RESTORING BROKEN BENCHES DURING OPERATIONS IN A PIT | 2003 |
|
RU2241120C1 |
METHOD OF REINFORCING SLOPES | 0 |
|
SU1587138A1 |
OPEN-CUT MINERAL DEPOSIT MINING METHOD | 2004 |
|
RU2258811C1 |
METHOD FOR DEVELOPING DEEP OPEN PITS IN CRYOLITIC ZONE | 2018 |
|
RU2676352C1 |
OPEN-PIT BENCH REINFORCEMENT METHOD | 2011 |
|
RU2477372C1 |
METHOD TO PROVIDE FOR STABILITY OF HIGH LEDGES | 2008 |
|
RU2392434C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
METHOD OF MULTI-STOREY BUILDING LIGHTENED FLOORS INSTALLATION | 2017 |
|
RU2652402C1 |
METHOD OF STRENGTHENING LEDGE BERM | 2023 |
|
RU2810374C1 |
METHOD FOR FORMATION OF NONMINING FLANK OF OPEN PIT UNDER PERMAFROST CONDITIONS | 1995 |
|
RU2099528C1 |
Authors
Dates
2004-03-10—Published
2002-08-22—Filed