METHOD TO PROVIDE FOR STABILITY OF HIGH LEDGES Russian patent published in 2010 - IPC E21C41/26 

Abstract RU 2392434 C1

FIELD: mining.

SUBSTANCE: invention is referred to a mining industry and can be used at development of mineral deposits. The method involves offset of steeply inclined and vertical ledges and board areas within middle and deep zones and application of traditional schemes for deviation of ledges and their fortification at the destruction stage with tension bars and resins. First one separates the stripping stratum of rock vertically into zones depending on fissuring and strength properties and offsets in them inclined, steeply inclined, vertical board areas with fixation in upper, middle and sometimes - deep zones during an open pit modification and deepening. Offset of a ledge slope on a berm horizon is performed with account for the row of production wells arranged above in proximity to the planned slope and berm. For that one places in them, to a height close to half the height of subgrade drilling, a strengthening mixture represented by a cement mixture or resin that during performance of explosive works flows into cracks and cements them. The water to cement ratio or the share of hardening additives to the resin is regulated with account for abundance of water in the rock and the duration of the period from the mixtures laying to performance of explosion and is introduced immediately before it. After formation of a cutoff crack and explosion of main wells and removal of rock to the ledge roof level one additionally strengthens the slope mass close to the ledge by way of drilling blast-holes along the slope and sets anchors in them which are connected to the bars inside outside the destruction-shear wedge. To retain the blocks and prevent their displacement in the slope one connects the anchors and the bars with a cable in a serpentine way; from the side of the slope wells (blast-hole) are drilled for anchors into the strengthened areas according to a certain grid corresponding to the strengthened elements and a metal net is hung at the height of the wedge destruction and on the surface to the retaining bars; in conclusion one performs filling with a cement mixture to prevent water inflow.

EFFECT: improved stability of the ledges.

1 ex, 6 dwg

Similar patents RU2392434C1

Title Year Author Number
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCE DEPOSITS 2005
  • Eremin Georgij Mikhajlovich
RU2304720C1
OPEN-CUT MINERAL DEPOSIT MINING METHOD 2004
  • Eremin G.M.
RU2258811C1
METHOD FOR OPEN MINING OF MINERAL RESOURCES DEPOSITS 2008
  • Eremin Georgij Mikhajlovich
RU2377407C1
OPEN-CUT METHOD OF MINING OF MINERAL DEPOSITS 2006
  • Eremin Georgij Mikhajlovich
RU2331769C2
SURFACE MINERAL MINING METHOD AND DEVICE 2005
  • Eremin Georgij Mikhajlovich
RU2310754C2
METHOD FOR EXTRACTING MINERAL RESOURCES DEPOSITS 2003
  • Eremin G.M.
RU2241119C1
REINFORCEMENT METHOD OF BANK SLOPES BY USING WIRE ROPE SYSTEM 2015
  • Eremin Georgij Mikhajlovich
RU2622933C1
METHOD FOR OPEN PIT MINERAL MINING 2004
  • Eremin Georgij Mikhajlovich
RU2282721C2
ROCK PREPARATION METHOD BY EXPLOSION 2019
  • Eremin Georgij Mikhajlovich
RU2735403C1
PROCEDURE FOR OPEN PIT DEVELOPMENT OF MINERAL DEPOSITS 2009
  • Eremin Georgij Mikhajlovich
RU2394158C1

RU 2 392 434 C1

Authors

Eremin Georgij Mikhajlovich

Dates

2010-06-20Published

2008-12-22Filed