FIELD: mining industry.
SUBSTANCE: method includes cleaning bench slope, drilling wells and cementing piles, mounting holding elements, fixing of these close to bench slope and filling of formed space by rocks. Drilling of wells and cementing of piles is performed along broken portion of slope, sections of support elements are mounted in completer form, by placing these behind piles on upper berm, and rigidly fixed, an after filling by rocks bench is planned for projected width.
EFFECT: lower laboriousness, lower costs.
3 cl, 4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF HAULAGE RAMP | 1995 |
|
RU2101502C1 |
METHOD OF REINFORCING SLOPES | 0 |
|
SU1587138A1 |
METHOD FOR FORMATION OF STEEPLY INCLINED TRANSPORT ACCESS TRACK | 2010 |
|
RU2425220C1 |
RESTORATION METHOD FOR QUARRY FACES, WHICH WERE DISRUPTED DURING EXPLOITATION THEREOF | 2002 |
|
RU2225479C1 |
METHOD OF OPEN-PIT MINING | 1996 |
|
RU2098627C1 |
METHOD FOR DEVELOPING DEEP OPEN PITS IN CRYOLITIC ZONE | 2018 |
|
RU2676352C1 |
QUARRY DEVELOPMENT METHOD | 1996 |
|
RU2118456C1 |
METHOD FOR EXTRACTION OF BY-SLOPE MINERALS | 1994 |
|
RU2054120C1 |
METHOD OF OPEN-CAST MINING OF STEEP DEPOSITS | 0 |
|
SU1033741A1 |
METHOD OF STRENGTHENING LEDGE BERM | 2023 |
|
RU2810374C1 |
Authors
Dates
2004-11-27—Published
2003-06-26—Filed