FIELD: equipment for preparing oil for transportation. SUBSTANCE: method includes using flexible pipe of "Koltubing" device for wash- out of mud laydowns. This pipe is equipped with perforated portion, which is in waterproof connection with wash-out head, which is an operating end of flexible pipe. Operating end of flexible pipe is inserted in waterproof reservoir for preparing oil according to given trajectory. Pressure of wash-out fluid on operating end of pipe is set to 0.8-1.0 megapascals. It is displaced inside the reservoir at speed of no more than 1 meter per minute when traction force on operating end of pipe is 2-3 kg per cubic centimeter. During the process of wash-out cycle and laydowns removal, consumption of wash-out fluid being injected into reservoir is kept 8-10 cubic meters per 1 cubic meter of mud laydowns. EFFECT: creation of technology for wash-out and removal of mud laydowns from oil preparation reservoirs. 3 cl, 1 ex, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CLEANING HORIZONTAL WELL BORE FROM SLURRY | 2021 |
|
RU2757385C1 |
METHOD FOR HYDRODYNAMIC CLEANING OF INTERNAL SURFACE OF PROCESS PIPELINES OF OIL AND OIL PRODUCT PUMPING STATIONS | 2017 |
|
RU2689629C2 |
COMBINED METHOD OF CLEANING INTERNAL SURFACE OF PROCESS PIPELINES OF OIL TRANSFER STATIONS WHEN PREPARING FOR PUMPING OF LIGHT OIL PRODUCTS | 2017 |
|
RU2699618C2 |
ACID TREATMENT OF AN OIL EXPLOITATION WELL BOTTOM-HOLE AREA | 2011 |
|
RU2441979C1 |
GEAR TO CLEAN RESERVOIRS FROM SLURRY CARRYING OIL | 1996 |
|
RU2159845C2 |
METHOD OF CLEANING PIPELINE (VERSIONS) AND DEVICE THEREFOR | 2015 |
|
RU2590548C1 |
METHOD OF TANK CLEANING OF OIL DEPOSITS AND INSTALLATION FOR ITS REALIZATION | 1997 |
|
RU2109583C1 |
SETTLER FOR TREATMENT OF OIL | 0 |
|
SU1690806A1 |
DEVICE FOR WASHING OUT BOTTOM SEDIMENTS OF LIQUID HYDROCARBONS IN A VERTICAL STEEL TANK | 2020 |
|
RU2743557C1 |
DRILLING ASSEMBLY ADAPTED FOR UNBALANCED PRODUCTIVE DEPOSIT DRILLING | 2004 |
|
RU2271429C2 |
Authors
Dates
2004-04-10—Published
2002-06-11—Filed