FIELD: seismology.
SUBSTANCE: method includes generation of longitudinal and transversal waves by means of vibroseismic oscillation sources. Said sources are placed on surface and/or in vertical, and/or in slanted, and/or in horizontal, and/or in branching wells. Then, vibroseismic treatment is performed on environment with hydrocarbon deposit by means of said generated longitudinal and transversal waves. Order of generation of transversal and longitudinal waves is controlled, or waves are generated concurrently. Also controlled is direction of longitudinal waves, by means of enabling respective vibroseismic oscillation sources and by polarity of transversal waves. System for realization of method has plurality of said sources, meant for placement on surface and/or in vertical, and/or in slanted, and/or in horizontal, and/or in branching wells. These are provided with means for generating oscillations, connected to computer by means of communication channels. Computer serves for controlling the order of generation of longitudinal and transversal waves, direction of longitudinal waves and polarity of transversal waves.
EFFECT: higher effectiveness of vibrotreatment of hydrocarbon deposits and of secondary oil extraction.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SEISMIC PROSPECTING METHOD | 0 |
|
SU1755224A1 |
METHOD OF VIBRATION SEISMIC SURVEY | 2017 |
|
RU2644442C1 |
METHOD OF WAVE EFFECT ON HYDROCARBON DEPOSIT | 2007 |
|
RU2361070C1 |
METHOD OF VIBROSEISMIC STIMULATION OF OIL POOL AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2155264C2 |
METHOD FOR SEISMICALLY INFLUENCING PRODUCTIVE FORMATION | 2005 |
|
RU2291956C2 |
PROCESS OF EXPLOITATION OF FLOODED OIL DEPOSITS | 1992 |
|
RU2057906C1 |
PROCESS OF EXPLOITATION OF FLOODED OIL FIELD AND GEAR FOR ITS IMPLEMENTATION | 1999 |
|
RU2163660C1 |
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS | 2007 |
|
RU2357073C2 |
METHOD OF DEVELOPMENT OF DROWNED OIL DEPOSIT AND DEVICE FOR VIBROSEISMIC TREATMENT OF THIS DEPOSIT | 1999 |
|
RU2172819C1 |
METHOD FOR HYDROCARBON DEPOSIT DEVELOPMENT ALONG WITH FORCE APPLICATION TO GEOLOGIC ENVIRONMENT | 2004 |
|
RU2268996C2 |
Authors
Dates
2004-09-10—Published
2002-01-28—Filed