FIELD: construction.
SUBSTANCE: method includes consolidating the top of a slope by laying the cloth and securing the edges of the cloth to the slope. Before laying, the step is made on the slope and a liquid binder is applied on the step. The bottom edge of the cloth is set on the step to form a chute. The chute is filled with the liquid binder, and then it is covered with sand.
EFFECT: enhanced reliability.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF MOTOR ROAD EMBANKMENT WITH GEOTEXTILE CAGE | 2023 |
|
RU2824541C1 |
METHOD FOR ERECTING SUBGRADE | 0 |
|
SU1663080A1 |
GROUND GABION | 1997 |
|
RU2131493C1 |
METHOD OF CONSOLIDATION OF CONES OF BRIDGES AND/OR OVERPASSES | 2000 |
|
RU2182200C1 |
METHOD FOR ERECTION OF EARTHFILL STRUCTURE, OF DAM TYPE WITH INSPECTION PATH ON SOFT GROUND | 2008 |
|
RU2366782C1 |
METHOD OF CONSTRUCTION OF COMBINED WATER INTAKE | 2022 |
|
RU2817417C2 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR RECONSTRUCTION OF MEGAPOLICE RING HIGHWAY | 1998 |
|
RU2135672C1 |
GROUND DAM | 2018 |
|
RU2680696C1 |
METHOD FOR CREATING AN ANTI-FILTRATION SAND-SAPROPEL CURTAIN | 2021 |
|
RU2778149C1 |
METHOD FOR CONSTRUCTION OF WATER DRAINAGE STRUCTURE | 1991 |
|
RU2025551C1 |
Authors
Dates
2004-10-10—Published
2003-03-24—Filed