FIELD: road construction.
SUBSTANCE: invention relates to road construction and can be used in construction of roads and bases in complex engineering-geological conditions, in particular for the needs of oil and gas industry, both in summer and winter seasons. Method for erection of motor road embankment comprises laying geosynthetic material, dumping soil thereon, whereupon free edges of the material are brought over the soil and fixed to form a cage, on top of which the upper part of the embankment is filled. Soil used is a peat-sand mixture, the content of peat in which is 30–70 vol.%, before placing and fixation of free edges, the peat-sand mixture is compacted, with additional filling of the peat-sand mixture, if necessary.
EFFECT: reduced value of embankment settlement and provision of its stability.
8 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF SUBGRADE OF CLUSTER PAD WITH GEOTEXTILE CAGES | 2023 |
|
RU2824540C1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
METHOD TO STRENGTHEN LOOSE NATURAL BASE FOR ERECTION OF ROAD EARTH BED | 2010 |
|
RU2449075C1 |
EARTHWORK ON SWAMPS WITH SUPPORT GROUND CARTRIDGE OF WIDENED TYPE | 2015 |
|
RU2594379C1 |
METHOD FOR CONSTRUCTION OF ROAD EMBANKMENTS ON WATERWEET AND PERMAFROST SUBSTRATES | 2022 |
|
RU2785985C1 |
MOTOR ROAD AT PERMAFROST GROUNDS | 2019 |
|
RU2732774C1 |
ROADBED AND ROADBED FORMING METHOD | 2005 |
|
RU2273687C1 |
METHOD FOR BUILDING ROAD BED | 1992 |
|
RU2043455C1 |
METHOD FOR CONSTRUCTION OF FLOATING BODY OF ROAD | 2013 |
|
RU2547193C1 |
AUTOMOBILE ROAD ON PERMAFROST | 2015 |
|
RU2580549C1 |
Authors
Dates
2024-08-09—Published
2023-12-28—Filed