FIELD: construction, applicable for working of foam-diatomite bricks.
SUBSTANCE: the method consists in successive working of all the surfaces. The opposite sides of bricks are worked simultaneously by a single block consisting of a set of cutting tools. First worked is the first pair of the opposite surfaces, then the second pair of the opposite surfaces, and then the third pair of the opposite surfaces.
EFFECT: enhanced dimensional accuracy of the worked bricks, enhanced capacity of working.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
ROTARY LINE OF WORKING OF FOAM-DIATOMITE BRICKS | 2002 |
|
RU2243894C2 |
INSTALLATION FOR WORKING OF FOAM-DIATOMITE BRICKS | 2002 |
|
RU2243893C2 |
METHOD OF MACHINING OF THE FOAM-DIATOMITE BRICKS AND THE INSTALLATION FOR ITS REALIZATION | 2006 |
|
RU2314911C2 |
METHOD FOR PRODUCTION OF FOAM-DIATOMITE BRICKS | 2009 |
|
RU2420493C2 |
METHOD OF PRODUCING GRANULATED FILLER FROM MOLLER RAW STOCK | 2009 |
|
RU2406707C1 |
METHOD OF FOAM-DIATOMITE BRICKS PRODUCTION | 2002 |
|
RU2225289C1 |
METHOD OF PREPARING FOAMED DIATOMITE RAW MEAL | 2002 |
|
RU2225381C1 |
COMPOSITION FOR OBTAINING LONG-ACTING ORGANIC-MINERAL FERTILISER | 2005 |
|
RU2333184C2 |
CRUDE MIXTURE FOR PREPARING POROUS AGGREGATE | 2009 |
|
RU2399596C1 |
CRUDE MIXTURE FOR PRODUCING HEAT-INSULATING MATERIALS | 2010 |
|
RU2433971C1 |
Authors
Dates
2005-01-10—Published
2002-07-29—Filed