FIELD: building, particularly piles for permanent and temporary foundation structures and artificial bases.
SUBSTANCE: method involves boring well; supplying hardening material in well; forming high-energy electric pulses to generate electric discharges with the use of discharger moving through hardening material; generating high-energy low-voltage pulses and forming additional low-energy high-voltage pulse simultaneously with generating each high-energy pulse to excite initiative electric discharge in moving discharger.
EFFECT: increased operational reliability and electric safety.
2 cl, 2 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CAST-IN-PLACE PILE FORMING | 2003 |
|
RU2250958C2 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2318960C2 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
METHOD OF CAST-IN-PLACE PILE MAKING | 2000 |
|
RU2193625C2 |
METHOD FOR PRODUCING CAST-IN-PLACE PILES | 1993 |
|
RU2039156C1 |
METHOD FOR ESTABLISHMENT OF CONSTRUCTIONS OF ARTIFICIAL FOUNDATIONS IN SOIL | 0 |
|
SU1685268A3 |
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
CAST-IN-PLACE PILE FORMING METHOD | 2004 |
|
RU2256029C1 |
METHOD OF PILE PRODUCTION | 2017 |
|
RU2654097C1 |
DISCHARGE SWITCH FOR GROUTING PILES | 2007 |
|
RU2358062C1 |
Authors
Dates
2005-04-27—Published
2003-07-14—Filed