METHOD FOR CAST-IN-PLACE PILE ERECTION Russian patent published in 2008 - IPC E02D5/34 

Abstract RU 2318960 C2

FIELD: construction, particularly to erect piles in foundations in the case of insufficient borehole wall stability, particularly to construct foundations of buildings under construction and reconstruction.

SUBSTANCE: method involves drilling borehole; supplying hardening material in the borehole; compacting thereof by electric charge application along with upward exciting zone movement. Borehole is drilled by auger drilling assembly having electric discharge device connected to one end thereof so that it may move forwards. Hardening material is injected in well along auger drilling assembly ribs. As auger drilling assembly reaches borehole bottom the drilling assembly is lifted without rotation thereof in well for height equal to 0.8-1.5 well diameters. After created volume filling with continuously supplied material, discharge device is moved forwards and electric discharge is applied to material. After that auger drilling assembly lifting and electric charge supply operations are repeated up to borehole filling for the full borehole depth. As auger drilling assembly is lifted drilling assembly may be rotated in direction opposite to that of borehole drilling to fill space created after auger drilling assembly lifting with hardening material. Filling completion moment corresponds to time when borehole intake is stopped.

EFFECT: increased pile quality, load-bearing capacity and pile body material strength, simplified pile production.

2 cl, 1 dwg, 2 ex

Similar patents RU2318960C2

Title Year Author Number
METHOD OF ERECTION RAMMING DESIGN IN SOIL 2015
  • Sokolov Nikolaj Sergeevich
  • Dzhantimirov Khristofor Avdeevich
  • Kuzmin Mikhail Vladimirovich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2605213C1
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE 1994
  • Gavrilov G.N.
  • Zajtsev A.A.
  • Borisenkov V.I.
  • Evdokimov V.S.
  • Gavrilov D.G.
RU2100525C1
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING 2019
  • Sokolov Nikolaj Sergeevich
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2720047C1
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2735077C1
METHOD FOR PRODUCING CAST-IN-PLACE PILES 1993
  • Gavrilov G.N.
  • Borisenkov V.I.
  • Evdokimov V.S.
  • Gavrilov D.G.
RU2039156C1
METHOD OF CAST-IN-PLACE PILE MAKING 2000
  • Jushchube S.V.
  • Shabanov D.V.
  • Glotov S.A.
RU2193625C2
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
  • Savchuk Aleksandr Dmitrievich
RU2725363C1
METHOD FOR BORED PILE ERECTION IN GROUND 2007
  • Bej Jurij Nikolaevich
  • Mishanov Vladimir Ivanovich
  • Kravchenko Aleksej Evgen'Evich
  • Bebenin Vladimir Jur'Evich
  • Cherkasov Vladimir Ivanovich
RU2317373C1
CAST-IN-PLACE PILE FORMING METHOD 2005
  • Ulitskij Vladimir Mikhajlovich
  • Rjabinov Vladimir Mikhajlovich
  • Andreev Andrej Viktorovich
RU2278212C1
CAST-IN-PLACE PILE FORMING METHOD 2003
  • Tavrin V.Ju.
  • Sokolov N.S.
  • Abramushkin V.A.
RU2250957C2

RU 2 318 960 C2

Authors

Sokolov Nikolaj Sergeevich

Rjabinov Vladimir Mikhajlovich

Tavrin Valentin Jur'Evich

Abramushkin Valerij Alekseevich

Dates

2008-03-10Published

2005-12-26Filed