FIELD: construction.
SUBSTANCE: pipeline is lied on ground to define a Z-shaped profile in plane of supports made of trancated tetrahedral pyramids. A table is mounted on the top of the pyramid. The slots provided in the table receives suspension with axle that bears on the table. The axle prevents the pipeline yoke against moving down. The bearing rods of the pyramid extend from the table to the supporting plates secured to the beams which are lied on ground.
EFFECT: expanded functional capabilities.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
PIPELINE OF ABOVE-GROUND INSTALLATION | 2007 |
|
RU2358177C1 |
SUPPORT FOR ABOVE GROUND PIPELINE | 2003 |
|
RU2246657C2 |
DEVICE FOR PROTECTION AGAINST HYDRAULIC IMPACT | 1996 |
|
RU2127395C1 |
METHOD OF PIPELINE LAYING IN THAWED INSULAR PERMAFROST COLLAPSING SOILS | 2016 |
|
RU2622681C1 |
PIPELINE COMBINED LAYING METHOD | 2006 |
|
RU2329428C2 |
HYDRANT | 1991 |
|
RU2042018C1 |
SUSPENSION SUPPORT FOR SECTIONS OF UNDERGROUND PIPELINE ROUTING | 2015 |
|
RU2601651C1 |
METHOD OF LAYING PIPELINES ON GROUND | 2006 |
|
RU2317466C1 |
METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL | 2022 |
|
RU2785329C1 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) | 2004 |
|
RU2249144C1 |
Authors
Dates
2005-07-20—Published
2003-06-16—Filed